21 103rd Ave NE, Bellevue
North of Main · Developer: Vander Hoek Corporation
Latest activity over three months agoTower proposed
Project with 176 units.
- Latest activityDec 2, 2025
About this project
This project has an approved phasing plan for the building permit (BB). This application is for Phase II which includes five levels of Type 3A construction which sits on top of two-and-a-half levels of subgrade structured parking of Type IA construction, plus three levels of above-grade Type IA unlimited-area podium construction covered by the Phase I Building Permit.
Permits
Construct eight (8) levels - Type IIIA construction over Type IA with three (3) levels of below-grade parking, mutli-family residential with approx. 11,000sf of retail on L1 and 137 units., 22-113953-DB
This project has an approved phasing plan for the building permit (BB). This application is for Phase II which includes five levels of Type 3A construction which sits on top of two-and-a-half levels of subgrade structured parking of Type IA construction, plus three levels of above-grade Type IA unlimited-area podium construction covered by the Phase I Building Permit.
Documents
Documents aren't available in this jurisdiction. Bellevue doesn't publish permit plans or project documents online; the city keeps copies of all approved plans and project files, available through a public records request: Development Services Records