Seattle Skyward Open the map

824 Broadway

Latest activity 6 days agoTower proposed

A 500-foot building.

About this project

The initial Thermal Energy Network (TEN) pilot project will be developed at Seattle University, providing an opportunity to demonstrate the technical and commercial viability of TENs within PSE's service territory. This project will serve as a foundation for potential expansion to additional sites subject to Washington Utilities and Transportation Commission ("WUTC") approval and demonstrated success. To date, PSE has submitted a 30% design filing to the WUTC to qualify for Department of Commerce funding. The current design is an estimated $18.5 million, 4-pipe, hot (180°F) and chilled (40°F) system, utilizes an industrial air source heat pump to provide 3,000 MBH of heating and 285 tons of cooling capacity. The proposed project will require the installation of approximately 1,500 feet of trenching to install pipe and the construction of two shipping container sized buildings to house the pump plant.

Permits

3044618-LUMaster UseAdditional Info Requested
The initial Thermal Energy Network (TEN) pilot project will be developed at Seattle University, providing an opportunity to demonstrate the technical and commercial viability of TENs within PSE's service territory. This project will serve as a foundation for potential expansion to additional sites subject to Washington Utilities and Transportation Commission ("WUTC") approval and demonstrated success. To date, PSE has submitted a 30% design filing to the WUTC to qualify for Department of Commerce funding. The current design is an estimated $18.5 million, 4-pipe, hot (180°F) and chilled (40°F) system, utilizes an industrial air source heat pump to provide 3,000 MBH of heating and 285 tons of cooling capacity. The proposed project will require the installation of approximately 1,500 feet of trenching to install pipe and the construction of two shipping container sized buildings to house the pump plant.
7166098-CNConstructionAdditional Info Requested
The initial Thermal Energy Network (TEN) pilot project will be developed at Seattle University providing an opportunity to demonstrate the technical and commercial viability of TENs within PSE's service territory. This project will serve as a foundation for potential expansion to additional sites subject to Washington Utilities and Transportation Commission ("WUTC") approval and demonstrated success. To date PSE has submitted a 30% design filing to the WUTC to qualify for Department of Comme

Documents

10 documents tracked here, newest first.
Nov 3, 2026Preliminary Assessment Report
Preliminary Assessment Report · 004225-26PA · Building & Land Use Pre-Application
Oct 6, 2026Preliminary Assessment Report
Preliminary Assessment Report · 004225-26PA · Building & Land Use Pre-Application
Sep 28, 2026Site Photos
Site Photos · 004225-26PA · Building & Land Use Pre-Application
Sep 23, 2026PASV Authorization Letter
PASV Authorization Letter · 004225-26PA · Building & Land Use Pre-Application
Sep 23, 2026PASV Authorization Letter
PASV Authorization Letter · 004225-26PA · Building & Land Use Pre-Application
Sep 2, 2026Map
Map · 004225-26PA · Building & Land Use Pre-Application
Aug 11, 2026Site Plan
Site Plan · 004225-26PA · Building & Land Use Pre-Application
Sep 26, 2022Permit
Permit · 6924220-CY · Conveyance Permit
Sep 26, 2022Record Snapshot
Record Snapshot · 6924220-CY · Conveyance Permit
Sep 26, 2022Record Snapshot
Record Snapshot · 6924220-CY · Conveyance Permit