Seattle Skyward

1035 116th Ave NE

Data updated November 27, 2026, 4:50 PM PT

Neighborhood: Wilburton

Completed

About this project

A 5-story replacement hospital tower with inpatient beds and ancillary program stands at 1035 116th Ave NE in Bellevue's Wilburton neighborhood, on a medical campus where earlier permits covered generator pads, imaging and procedure rooms, and surgery space. The tower took shape through a preapplication conference in December 2016, then a Master Development Plan (17 111079 LP) and a design review (17 111083 LD) filed in April 2017, with the design review issued in December 2017. Construction was split between a foundations and structure package for the new east tower and a second package carrying the remaining structure, enclosure, and tenant work.

Latest activity

Aug 14, 2026 update

The newest permit in the file is a city overlay grading record (25 102050 GD) for curb-ramp and pavement work at the address, closed in August 2026. The hospital tower itself was completed in October 2023, when its two major construction permits (17 128535 BB and 18 116015 BB) closed, ending a build that began with shoring and excavation permits issued in 2018.

Timeline

Permits

12 111220 BWMinor Commercial ProjectClosed
Install 2 new concrete pads in southwest court yard for new emergency generator and associated switch gear.
12 116696 BWMinor Commercial ProjectClosed
Remodel to create imaging and procedure rooms, recovery suite and support spaces. Add screening for rooftop unit.
13 130388 BWMinor Commercial ProjectClosed
Replacement awnings over loading docks.
15 130433 DBPreapplication ConferenceClosed
Conf: 1/13/16 @ 3 pm. New building.
16 144177 LJLand Use ExemptionClosed
ADR
16 144178 LJLand Use ExemptionClosed
MDP
16 149283 DBPreapplication ConferenceClosed
Patient tower addition to existing hospital.
17 104565 BWMinor Commercial ProjectClosed
Install new underground 20,000 gallon fiberglass fuel tank for emergency generator diesel fuel supply. Install new Gen 4 and Gen 5 day tanks.
17 111079 LPMaster Development PlanClosed
5 story replacement hospital tower comprised of inpatient beds and ancillary program.
17 111083 LDDesign ReviewClosed
5 story replacement hospital tower comprised of inpatient beds and ancillary program.
17 113367 BMMedium Commercial ProjectClosed
ADDITION OF TWO NEW OPERATING ROOMS TO THE EXISTING SURGERY DEPARTMENT AT THE SURGERY PAVILLION BUILDING (OR-2 DESIGN PACKAGE IS ONLY CORE AND SHELL INFORMATION, THE FINISH-OUT WILL OCCUR AS PART OF THE FUTURE OR-3 DESIGN PACKAGE). THIS ADDITION WILL BE APPROXIMATELY 3,400 SQUARE FEET.
17 114126 GDClearing & GradingClosed
ADDITION OF TWO NEW OPERATING ROOMS TO THE EXISTING SURGERY DEPARTMENT AT THE SURGERY PAVILLION BUILDING (OR-2 DESIGN PACKAGE IS ONLY CORE AND SHELL INFORMATION, THE FINISH-OUT WILL OCCUR AS PART OF THE FUTURE OR-3 DESIGN PACKAGE). THIS ADDITION WILL BE APPROXIMATELY 3,400 SQUARE FEET.
17 120388 GDClearing & GradingClosed
REROUTE SANITARY SEWER, STORM DRAINAGE AND OTHER SITE UTILITIES FOR NEW EAST TOWER CONSTRUCTION.
17 128535 BBMajor Commercial Project Closed
THIS PACKAGE WILL COVER FOUNDATIONS AND STRUCTURE OF THE NEW EAST TOWER UP THROUGH THE SLAB AT LEVEL 1, WHICH IS APPROXIMATELY GRADE LEVEL. IT WILL CONTAIN THE DEMOLITION OF THE EXISTING EAST TOWER DOWN TO GRADE LEVEL AND ALL FINISHED SITEWORK AS WELL AS PARTIAL DEMOLITION OF SOUTH TOWER "PROW" AND ELEVATOR MACHINE ROOM REVISIONS. THIS PACKAGE WILL COVER EARLY OCCUPANCY OF THE NEW VEHICLE ACCESS TUNNEL TO THE EXISTING PARKING GARAGE BELOW SOUTH TOWER. ALL OTHER T.I. AND THE REMAINING SCOPE OF NEW EAST TOWER WILL BE CARRIED IN "NET-3".
17 128536 GDClearing & GradingClosed
THIS PACKAGE WILL COVER FOUNDATIONS AND STRUCTURE OF THE NEW EAST TOWER UP THROUGH THE SLAB AT LEVEL 1, WHICH IS APPROXIMATELY GRADE LEVEL. IT WILL CONTAIN THE DEMOLITION OF THE EXISTING EAST TOWER DOWN TO GRADE LEVEL AND ALL FINISHED SITEWORK AS WELL AS PARTIAL DEMOLITION OF SOUTH TOWER "PROW" AND ELEVATOR MACHINE ROOM REVISIONS. THIS PACKAGE WILL COVER EARLY OCCUPANCY OF THE NEW VEHICLE ACCESS TUNNEL TO THE EXISTING PARKING GARAGE BELOW SOUTH TOWER. ALL OTHER T.I. AND THE REMAINING SCOPE OF NEW EAST TOWER WILL BE CARRIED IN "NET-3".
17 131005 BWMinor Commercial ProjectExpired
Temporary construction of ~1100 lf of chain link fence and ~ 700 lf of wood fence
17 131086 BVShoring PermitClosed
Shoring and excavation within the project site in preparation for the construction of the New East Tower NET-2 foundations and parking garage basement., 17-128536 GD
18 116015 BBMajor Commercial Project Closed
THIS PACKAGE WILL COVER THE REMAINING STRUCTURE AND ENCLOSURE FROM LEVEL 1 UP THROUGH THE ROOF, AS WELL AS, THE CONNECTOR THAT LINKS MULTIPLE BUILDINGS ON CAMPUS. ALSO, THE PACKAGE INCLUDES ALL OF THE T.I. AND TIE-IN REMODEL WORK ASSOCIATED WITH THE NEW EAST TOWER. IN GENERAL THE SCOPE INCLUDES: LAB, PHARMACY, OUTPATIENT CLINIC, PUBLIC LOBBY AND CIRCULATION, ADMISSIONS, OBED, LABOR AND DELIVERY, ANTE AND POST PARTUM, NICU, A TELEMETRY/ONCOLOGY UNIT, AND AN ORTHO UNIT.
25 102050 GDClearing & GradingClosed
The 2025 Overlay Program is a component of the City's pavement maintenance program. The project retrofits existing curb ramps with ADA-compliant curb ramps and will then grind and overlay the existing asphalt pavement.

Documents

Bellevue does not publish permit documents. Permit records are at MyBuildingPermit.