15027 NE Bellevue-Redmond Rd
Data updated November 27, 2026, 4:50 PM PT
Completed
About this project
Highland Middle School at 15027 NE Bellevue-Redmond Rd in Bellevue's Crossroads neighborhood is a new middle school for grades 6 to 8, built for a projected 1,200 students plus 45 more in a Central Services program on the lower level, with a small storage building, a bus waiting shelter, and replaced play fields. A preapplication conference (16 145880 DB) in November 2016 covered demolishing the old school and building the new one, and the design review (18 103077 LD) was filed in January 2018 and issued that March.
Latest activity
Feb 19, 2025 update
The most recent permit, a retaining wall supporting a vehicle turnaround on the school property (22 105834 BW), closed in February 2025 and gives the record its completion date. The school building permit itself (18 103042 BB) closed in July 2021, after issuance in August 2018.
Timeline
- ProposedNov 2, 2016
- Construction startedJul 5, 2018
- CompletedFeb 19, 2025
Permits
Conference: 11/16/2016 1:30 pm. Demo old school and construct new school.
The proposed project will include the complete redevelopment of all school facilities. Renovations include a new school building, paved parking lots, driveways, walkways, multi-purpose turf playfield, track/turf field, plaza areas, and landscaping
Construction of a new middle school, grades 6-8. The existing school will be demolished under separate permit. Project also consists of a small storage building and bus waiting shelter. Existing play fields will be replaced with new. Projected student population is 1,200 plus an additional 45 students in the Central Services program located on the lower level of the building. Anticipated teaching staff is 91. Main building construction type is IIB with 2-hour fire walls. Primary building occupancy is E - Education.
Construct new school. Existing school to be demolished. Existing play fields will be replaced with new fields.
Retaining wall to support vehicular turn around and function as vehicular guard for Evergreen Transition New Home project's vehicular turn around on the Highland Middle School property accessed from 152nd Ave NE. No work in HMS building, only at exterior utilities & grading., 22-101749 LD, 22 103616 BB
Documents
Bellevue does not publish permit documents. Permit records are at
MyBuildingPermit.