The Bellevue College campus at 3000 Landerholm Cir SE in Bellevue's Eastgate neighborhood is counted here for its apartment-style student housing building (16 141356 BB): 147 units with 350 beds, public space and a small cafe at ground level and a second-level roof deck. The wider permit family is campus-wide and also covers a 3-story laboratory and classroom building, a student success center, and an art building addition and renovation, among many smaller campus projects.
Extension of existing concrete loading dock.
Conference July 7, 2010, 1:30 pm. New building for higher education classes, labs and offices.
Addition and remodel of offices.
Approx 1900 sq ft addition, interior build-out of this addition, and interior remodel of approx 5,000 sq ft space to house faculty, research and support offices.
Remove existing parking lots and replace with new classroom building.
Construction of a new 3 story building to house laboratories and offices for nursing and imaging education as well as general classrooms.
Installation of exterior emergency generator for Bellevue College Radio Station on approx 33 sf concrete slab in fenced enclosure.
Remove existing paving and landscape area for a new pedestrian area and landscape area.
Renovations of existing bookstore and testing center, new canopy, and bookstore plaza.
Project consists of Providing floodlight poles (8 poles) including new foundations for the existing baseball field.
Install a 82-68 PV array on Bldg R
Replacement of 5 existing exterior stairs wit new. Size to match. Stair 1 – Building A, Stair 2 – Building A, Stair 3 – Building B, Stair 5 – Building C, Stair 6 – Building C
Resurfacing of existing natural turf field into single multi purpose, artificial playing surface for softball and soccer. Other improvements include, but not limited to: site utilities, retaining walls, concrete ramps and stairs, concrete plaza, and field lighting. Project also includes construction of single story 135 SF CMU toilet building, 135 SF CMU storage building, and two CMU and steel framed dugouts.
Reurfacing of existing natural turf field into single multi purpoe, artificial playing surface for softball and soccer. Other improvements include, but not limited to: retaining walls, concrete ramps and tairs, concrete plaza, and field lighting. Project also includes contruction of single story toilet building, storage building, and two CMU steel framed dugouts.
Resurfacing of existing natural turf field into single multi purpose, artificial playing surface for softball and soccer. Other improvements include, but not limtied to site utilities, retaining walls, concrete ramps and stairs, concrete plaza, and field lighting. Project also includes construction of single story 135 SF CMU Toilet Building, 135 SF CMU Storage Building, and TWO CMU and steel framed dugouts. This permit is a subsequent application to the previous building permit. This is for 135 SF Storage Building and dugout.
The proposed renovation project includes a reconfiguration of 12,560 GSF of the 2nd floor. This includes an infill of 1,500 GSF of new roof within the work area and the enclosure of 1410 GSF of covered exterior walkway to interior conditioned space. 125424
The project is a maintenance project to existing parking lots 6 & 8 on the Bellevue College campus. The major portion of the project includes asphalt pavement overlay of lots 6 and 8 at the existing pavement limits with minor areas of base repair & replacement, and select minor curb location revisions. A single storm catch basin with approximately 20 LF of storm pipe is proposed to be added to a low point within parking lot 10 and will connect to an adjacent catch basin that is part of the Bellevue College private storm conveyance system.
Revision # 1, extend the clearing limits into the right-of-way for trucking and material storage (as shown on this plan). TESC measures will be installed with accordance with approved Clear and Grade Permit # 16 136765 GD.
Demolition of existing parking lot improvements, mass grading to remove unsuitable soils and to prepare building pads for future construction, installation of sanitary sewer to serve future buildings.
NEW 350 BED APARTMENT-STYLE STUDENT HOUSING BUILDING (147 UNITS). INCLUDES PUBLIC SPACE ON GROUND LEVEL W/SMALL CAFE, MULTIPURPOSE SPACE, AND SECOND LEVEL ROOF DECK, PLUS SITE IMPROVEMENTS.
3 space parking lot and pave additional turn-lane in existing roundabout intersection
New student success center and associated site work for Bellevue College.
Construction of a student success center with student services such as welcome center, testing, advising, counseling, meeting rooms, community commons and mechanical spaces.
This project included the installation of two steel canopy's with gutters and downspouts at the Northwest corner of the existing athletic field. The existing condition includes all infrastructure required to facilitate the installation of the steel canopy such as anchor bolts and connection points. Project was previous permitted under this permit number, 15 129628 BM, which has expired. The permit we are seeking is to complete the remaining work that was not completed under the previous permit number., 15 129628 BM
The project includes the repair of three existing parking lots on the Bellevue College campus. The repair involves a new 2" asphalt overlay with new extruded curbs at the pavement edge. There will be isolated full depth pavement replacement to address significant subgrade failure in one lot. Full depth replacement will be limited to 1,985 SF., NA
The project will repair 4 parking lots. The repair involves a new 2" asphalt overlay with new extruded curbs at the pavement edge, and the full depth replacement of 80 square feet for the installation of 3 removable bollards. The project will also construct eco block walls on a portion of the existing parking lot for material storage.
Refresh existing play ground with new paving and landscape areas.
Construction of canvas canopy in early learning center playground
The proposed project is an addition and renovation of an existing art, studio, shop and classroom building on the Bellevue College campus.
The renovated existing building (currently referred to as Building C north) is a portion of a much larger series of connected buildings. 6,116 SF of the existing building is demolished and 39,696 SF is built new for a total increase in 33,580 SF. The interior of the building is comprehensively renovated. The completed renovation and addition project will be known as Building W and totals approximately 59,000 GSF.
The project includes related site improvements including an outdoor work yard to support the educational programs., 23-102839 DC
New shade fabric canopy and associated structure over an existing playground at the Bellevue College Early Learning Center (Bldg Q).
This project will re-pave, re-stripe, and install new curb in the existing parking lot 1A on Bellevue College's campus. The pavement activities will primarily be a 2-inch overlay. No subgrade will be exposed for the majority of paving operations. A new access between parking lot 1A and parking lot 1b (to the north) will be installed to facilitate traffic flow and improve safety in the parking lot.
Addition and renovation of an existing art, studio, shop and classroom building on the Bellevue College campus. Project includes related site improvements including an outdoor work yard to support the educational programs., 23 128546 LJ
Addition and renovation of an existing art, studio, shop and classroom building on the Bellevue College campus. The renovated existing building (currently referred to as Building C north) is a portion of a much larger series of connected buildings. 6,116 SF of the existing building is demolished and 39,696 SF is built new for a total increase in 33,580 SF. The interior of the building is comprehensively renovated. The completed renovation and addition project will be known as Building W and totals approximately 59,000 GSF., 23 128546 LJ
Exemption needed so that Bellevue College can remove unhealthy and hazard trees on is campus grounds, 24 113391 GB
Installation of 8 inch and 10inch RPBA per City of Bellevue requirements. Also includes replacement of 10 inch water meter for the City. See attached cover letter for more information., 25 129236 DC.
COB Utilities Co-Shared portion of this project includes water main relocation.
The west half of Kelsey Creek Road will be ground, overlaid, and restriped to match existing conditions. The east half of the roadway will be replaced with full-depth asphalt pavement and restriped. Additional improvements include new curb and gutter and a new concrete sidewalk adjacent to the east side of the road. A portion of SE 24th Street will be ground and overlaid., 26 102039 GB 26 114176 UE
PROPOSED PROJECT INCLUDES NEW SITE STRIPING, PAVEMENT MARKINGS, SITE SIGNAGE, AND THE INSTALLATION OF FOUR NEW ELECTRIC VEHICLE CHARGING STATIONS WITH ELECTRICAL UTILITY CONNECTIONS ROUTED FROM THE EXISTING BUILDING.
PROPOSED PROJECT INCLUDES NEW SITE STRIPING, PAVEMENT MARKINGS, SITE SIGNAGE, AND THE INSTALLATION OF FOUR NEW ELECTRIC VEHICLE CHARGING STATIONS WITH ELECTRICAL UTILITY CONNECTIONS ROUTED FROM THE EXISTING BUILDING.