100 Broadway E
Data updated November 27, 2026, 4:50 PM PT
Neighborhood: Capitol Hill
Proposed
About this project
The site at 100 Broadway E in Seattle's Broadway neighborhood was first filed in December 2007 with a mixed use building holding retail, office, and restaurant space at ground level and housing above, with about 70 parking stalls below grade on a site of about 15,360 square feet, under early design guidance (3005511-EG) and a Master Use application (3005511-LU). The same address also carried the Capitol Hill Station light rail facility, a 15,500 square foot transit facility with 3 station entries and a vent shaft, under a separate Master Use Permit (3009795-LU).
Latest activity
Jul 18, 2018 update
The most recent dated fact is the construction permit for the station entries (6200725-CN), completed in July 2018. The mixed use applications (3005511-EG and 3005511-LU) were canceled in December 2010, the station construction and staging permit (3007888-LU) was issued in June 2008, and nothing has been filed at the site since July 2018.
Timeline
Permits
Early Design Guidance for: PROJECT CANCELLED 12/15/10 -- Design Review / SEPA / NC of +/- 15,360 sq ft site / mixed use bldg with retail, office, restaurant on ground floor and residential above; sub-grade parking +/- 70 stalls.
PROJECT CANCELLED 12/15/10 -- Design Review / SEPA / NC of +/- 15,360 sq ft site / mixed use bldg with retail, office, restaurant on ground floor and residential above; sub-grade parking +/- 70 stalls.
Land Use Application to allow light rail transit facility construction and staging area (Capitol Hill Station). Review includes demolition of 17 buildings (84,816 sq. ft. of retail and restaurant uses, 81 residential units and 116 parking spaces) and excavation of 133,530 cu. yds. of material. Related projects under #3007887 and #3007889. Final Environmental Impact Statement (November 1999) and the North Link Final Supplemental Environmental Impact Statement (April 2006) prepared by Sound Transit.
Land Use Application to allow a 15,500 sq. ft. transit facility (Sound Transit, Capitol Hill Station) including three station entry buildings and one 1,500 sq. ft. vent shaft. Related projects under 3009792 (west station entry located 1827 Broadway) and 3009794 (south station entry located at 1830 Broadway). Final Environmental Impact Statement (November 1999) and the North Link Final Supplemental Environmental Impact Statement (April 2006) has been prepared by Sound Transit.
Construct North transit entry. Construct three Sound Transit Station entries and occupy per plans.
Documents
City documents for this project's records are filed at Seattle EDMS: