1000 6th Ave S
Data updated November 27, 2026, 4:50 PM PT
Proposed
About this project
The phased office development at 1000 6th Ave S in Seattle's SODO neighborhood, first filed in November 2017, was approved as 2 office buildings of 8 and 10 stories with ground floor retail and parking for 137 vehicles below grade, under a Master Use Permit (3019132-LU) that followed early design guidance (3019132-EG) describing 2 buildings of 9 stories each. An amendment (3036767-LU) later expanded the approved development to 3 office buildings, adding a parcel, the demolition of a building at 1101 Airport Way S, 60,000 square feet of floor area, and 85 parking stalls.
Latest activity
Feb 3, 2022 update
The newest permits in the file are 2 demolition permits (6720939-DM and 6776991-DM) issued in March 2022 and since expired. The amendment (3036767-LU) was issued in March 2022, a shoring and excavation permit (6514486-CN) filed in February 2021 sits in corrections, and the original Master Use Permit (3019132-LU) expired after its March 2019 issuance.
Timeline
Permits
Early Design Guidance for: Land Use Application to allow two office buildings (9 stories each) with ground floor retail space. Parking for 464 vehicles to be provided below grade. Addendum to Livable South Downtown Planning Study Final EIS has been prepared.
Land Use Application to allow two office buildings (8 and 10 stories) with ground floor retail space. Parking for 137 vehicles to be provided below grade. Addendum to Livable South Downtown Planning Study Final Environmental Impact Statement (EIS) has been prepared.
Land Use Application to allow an amendment to an approved Major Phased Development of 3 office buildings with retail and parking (MUP 3019132-LU). The amendment includes an additional parcel of land to the development, demolition of an additional building (1101 Airport Way S), 60,000 sq ft additional floor area, and 85 additional parking stalls. .
Shoring and excavation for construction of two towers with below grade parking per plan. (deep foundations included)
Demolish existing commercial building per plan. Building permit issuance is required prior to the final inspection for this demolition permit; or all disturbed areas shall be fully stabilized and side sewers shall be capped.
Demolish commercial building per plan
Documents
City documents for this project's records are filed at Seattle EDMS: