1000 Olive Way
Data updated November 27, 2026, 4:50 PM PT
Neighborhood: Downtown Seattle
- Stories16
- City documents on file1,016
- Latest activityApr 24, 2024
About this project
At 1000 Olive Way in Seattle's Denny Triangle, a 16-story office building with retail at street level was first filed in March 2015. The scheme placed the office tower above the convention center loading dock and required demolition of the existing buildings, along with street and alley vacations. Early design guidance proceeded under 3020177-EG, and the Master Use Permit (3020177-LU) was issued in June 2018. Construction was carried as a phased project (6550917-PH), with mechanical work included in the same permit family.
Latest activity
Apr 24, 2024 update
The Certificate of Occupancy for the phased project (6550917-PH) was issued in April 2024, and the project was completed that month. Temporary Certificates of Occupancy had been issued in December 2023 and March 2024 ahead of the final certificate. The file holds 660 special-inspection reports, the most recent dated December 2023. Construction had begun in October 2020 under the phased permit.
Timeline
- ProposedDec 16, 2015
- Construction startedOct 5, 2020
- CompletedApr 24, 2024