Seattle Skyward Map Stats

1534 Broadway

Latest activity over two weeks agoUnder construction

About this project

1534 Broadway in Seattle's Broadway neighborhood is a mixed-use building site where an earlier scheme proposed an 8-story building with 84 apartments alongside institution and retail space, with no parking, existing buildings to be demolished, and the facade at 909 E Pine St retained. That scheme went through early design guidance (3036495-EG) and a Master Use application (3036322-LU), both later withdrawn. A subsequent construction permit (6777638-CN) covers a new mixed-use building on the site, and a demolition permit (6933857-DM) covered the existing 3-story commercial building.

Latest activity

Oct 23, 2026 update—

The newest items in the file are electrical permits (7111108-EL and 7087604-EL) dated October 23, 2026, and the site is under construction. On October 2, 2026, inspectors under the construction permit (6777638-CN) tested soils and compaction and observed asphalt compaction for the gutter and eastbound lane fills along the Broadway sidewalk, placed in 3-inch to 3.5-inch lifts, with 6 in-place density tests recorded. On August 18, 2026, a welding and ultrasonic examination at Level 2 post-tensioned slab connections and foundation stem-wall welds found the work not in conformance at the time of observation. A tenant-improvement permit for the Youth Care Academy on levels 1 through 3 (7007028-CN) is listed as issued.

Permits

6777638-CNConstructionIssued
Construct new mixed use building occupy per plan.
3036322-LUMaster UseWithdrawn
Land Use application to allow an 8-story, 84-unit apartment building with institution and retail. No parking proposed. Existing buildings to be demolished, facade at 909 E Pine St to remain. Early Design Guidance conducted under 3036495-EG.
7007028-CNConstructionIssued
Construct initial tenant improvement to existing mixed use building on levels 1-3 (Youth Care Academy) occupy per plan.
6132641-CNConstructionCompleted
Replace windows infill basement windows replace storefront and exterior stucco repair to existing office for "Seattle Community College" South Annex building per plan.
6586194-CNConstructionCompleted
Construct tenant improvements to new tattoo parlor per (STFI)
3036495-EGEarly Design GuidanceWithdrawn
Administrative Design Review for an 8-story, 84-unit apartment building and institution. No parking proposed. Existing buildings to remain.
6933857-DMDemolitionCompleted
Demolish existing 3-story commercial building per plans. (shoring under record 6777638-CN)

Documents

60 documents tracked here, newest first — of 574 on file with the city.
Oct 23, 2026Permit
Permit · 7087604-EL · Electrical Permit: Plan Review
Oct 23, 2026Permit
Permit · 7111108-EL · Electrical Permit: Plan Review
Oct 21, 2026Permit
Permit · 7117003-EL · Electrical Permit: Over the Counter
Oct 19, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Oct 19, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Sep 29, 2026Record Snapshot
Record Snapshot · 7164190-CY · Conveyance Permit
Sep 29, 2026Permit
Permit · 7164190-CY · Conveyance Permit
Sep 29, 2026Record Snapshot
Record Snapshot · 7164190-CY · Conveyance Permit
Sep 29, 2026Record Snapshot
Record Snapshot · 7164189-CY · Conveyance Permit
Sep 29, 2026Permit
Permit · 7164189-CY · Conveyance Permit
Sep 29, 2026Record Snapshot
Record Snapshot · 7164189-CY · Conveyance Permit
Aug 26, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Aug 24, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Aug 24, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Aug 21, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Aug 21, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Aug 21, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Aug 19, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Aug 19, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Aug 19, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Aug 13, 2026Permit
Permit · 7087604-EL · Electrical Permit: Plan Review
Aug 11, 2026Special Inspection Final Report
Special Inspection Final Report · 6777638-CN-005 · Special Inspection
Aug 7, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Aug 4, 2026Special Inspection Field Report
Special Inspection Field Report · 7136930-ME-003 · Special Inspection
Aug 4, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 31, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 27, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 24, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 23, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 23, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 23, 2026Approved Cover Sheet
Approved Cover Sheet · 7136930-ME · Mechanical Permit
Jul 23, 2026Permit
Permit · 7136930-ME · Mechanical Permit
Jul 23, 2026Record Snapshot
Record Snapshot · 7136930-ME · Mechanical Permit
Jul 23, 2026Statement of Financial Responsibility/Agent Authorization
Statement of Financial Responsibility/Agent Authorization · 7136930-ME · Mechanical Permit
Jul 22, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 22, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 22, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 22, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 22, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 17, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 14, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 10, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 10, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 10, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 8, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 8, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 2, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 2, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 1, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 1, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jul 1, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jun 26, 2026Correction Response
Correction Response · 7136930-ME · Mechanical Permit
Jun 24, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jun 24, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jun 24, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jun 24, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jun 24, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jun 24, 2026Special Inspection Field Report
Special Inspection Field Report · 6777638-CN-006 · Special Inspection
Jun 15, 2026Permit
Permit · 7148197-EL · Electrical Permit: Over the Counter
Jun 15, 2026Record Snapshot
Record Snapshot · 7148197-EL · Electrical Permit: Over the Counter
Return to the map