Latest activity over three months agoTower proposed

25-story towers with 668 units and retail.

About this project

Three residential towers of 10, 20 and 25 stories holding 668 homes, with 21,784 square feet of ground-level retail and 399 above-grade parking stalls, were proposed at 201 S King St in Pioneer Square, Seattle, under a Master Use application (3009251-LU) that also included a 20-story office building. The residential scheme was phased around a shared podium, and a later phase proposed another residential tower on the existing podium base under 6691365-PH, with 16-story tower construction applications filed as 6690236-CN and 6708986-CN.

Latest activity

Mar 3, 2026 update—

The newest document in the file is a consolidated conveyance correction report (EQP-SI-08709) from October 2026. Before that, an electrical permit (7131060-EL) was filed in March 2026, and a permit was recorded in December 2025 for the phased tower permit (6691365-PH), which stands issued. The two 16-story tower construction applications (6690236-CN and 6708986-CN) both still await additional information, and the remaining tower work remains a proposal in permitting.

Permits

6691365-PHPhasedIssued
Phased project for construction of a residential (apartment) tower on an existing podium base and occupy per plan. Mechanical included.
3006376-LUMaster UseCompleted
Land use application to allow a buried underground air quality odor control vault, above grade electrical facility with screening wall, and a 30 foot tall exhaust stack. Project includes 4,300 cu.yds. of grading and a buried air duct along King St. Determination of non-significance prepared by King County Wastewater Treatment Division.
3007096-LUMaster UseCompleted
Land use application to adjust the boundary between two parcels of land. Proposed parcel sizes are: A)167,513 sq.ft. B)14,565 sq.ft. Existing pedestrian overpass to remain.
3008308-LUMaster UseCompleted
Land use application to adjust the boundary between two parcels of land. Proposed parcel sizes are: X)15,003 sq.ft. Y)75,205 sq.ft. Z)77,305 sq.ft. Existing pedestrian overpass to remain.
3009251-LUMaster UseCompleted
Land Use Application to allow one residential building (668 units) distributed among three towers (10, 20 and 25-stories) with ground level retail (21,784 sq. ft.) and 399 above grade parking stalls and one, 20-story 424,061 sq. ft. office building with ground level retail (11,762 sq. ft.) and 502 (491 stalls are replacement parking for Qwest Field) above grade parking stalls. Project includes 25,000 cu. yds. of grading. Project includes an Addendum to the EIS prepared by City of Seattle (Livable South Downtown Planning Study - May 2008).
3012468-LUMaster UseCompleted
Land use application to adjust the boundary between two parcels of land. Proposed parcel sizes are: A)103,221 sq. ft. B)64,291 sq. ft.
3019381-LUMaster UseExpired
Land Use Application to allow a minor communication utility (NextNav) consisting of 1 omni antenna and 1 equipment cabinet to be located on the rooftop of an existing building.
6270796-PHPhasedCompleted
Phased Project: Construction of a residential retail and parking podium building including west tower and occupy per plan.
6305752-PHPhasedCompleted
Phased Project: Construction of South tower for a residential retail and parking podium building and occupy per plan (Podium constructed under AP 6270796).
6690236-CNConstructionAdditional Info Requested
Construction of a 16 story tower on an existing 4 story podium base.
6708986-CNConstructionAdditional Info Requested
Construction of a 16 story tower on an existing 4 story podium base.
6088165-CNConstructionCompleted
Truss upgrade for rigging equipement. Structural review only under this permit per plans.
6109583-CNConstructionCompleted
Create a demountable concert/assembly venue within Qwest Exhibition Center and mechanical included per plans.
6114022-CNConstructionCompleted
Construct Sign Marquee Frame to West facade of Exhibition Center per plan.
6122056-CNConstructionCompleted
Establish use as public utility and construct 1156 sf underground air quality odor control vault above grade 348 sf electrical facility and exhaust stack and occupy per plans.

Documents

47 documents tracked here, newest first — of 1,030 on file with the city.
Nov 6, 2026Equipment Operating Certificate
Equipment Operating Certificate · EQP-SI-08709 · Site - Equipment
Oct 15, 2026Equipment Inspection Corrections
Equipment Inspection Corrections · EQP-SI-08709 · Site - Equipment
Sep 22, 2026Site Invoice
Site Invoice · EQP-INV-08709-005 · Site - Invoice
Mar 3, 2026Permit
Permit · 7131060-EL · Electrical Permit: Plan Review
Mar 3, 2026Record Snapshot
Record Snapshot · 7131060-EL · Electrical Permit: Plan Review
Feb 26, 2026Record Snapshot
Record Snapshot · 7131060-EL · Electrical Permit: Plan Review
Dec 10, 2025Permit
Permit · 6691365-PH · Phased Project Permit
Nov 6, 2025Record Snapshot
Record Snapshot · 6691365-PH-014 · Renewal Request
Oct 27, 20255-year safety test
5-year safety test · EQP-SI-08709 · Site - Equipment
Oct 21, 2025Record Snapshot
Record Snapshot · 7112841-FS · Fire Sprinkler and Suppression Permit
Oct 21, 2025Permit
Permit · 7112841-FS · Fire Sprinkler and Suppression Permit
Oct 21, 2025Equipment Operating Certificate
Equipment Operating Certificate · EQP-SI-08709 · Site - Equipment
Sep 30, 2025Site Invoice
Site Invoice · EQP-INV-08709-004 · Site - Invoice
Jul 7, 2025Permit
Permit · 7094789-EL · Electrical Permit: Over the Counter
Jul 7, 2025Record Snapshot
Record Snapshot · 7094789-EL · Electrical Permit: Over the Counter
Apr 22, 20255-year safety test
5-year safety test · EQP-SI-08709 · Site - Equipment
Jan 30, 20255-year safety test
5-year safety test · EQP-SI-08709 · Site - Equipment
Nov 14, 2024Equipment Operating Certificate
Equipment Operating Certificate · EQP-SI-08709 · Site - Equipment
Oct 30, 2024Equipment Operating Certificate
Equipment Operating Certificate · EQP-SI-08709 · Site - Equipment
Oct 22, 2024Site Invoice
Site Invoice · EQP-INV-08709-003 · Site - Invoice
Oct 8, 2024Site Invoice
Site Invoice · EQP-INV-08709-002 · Site - Invoice
Sep 5, 2024Equipment Operating Certificate
Equipment Operating Certificate · EQP-SI-08709 · Site - Equipment
Sep 5, 2024Equipment Operating Certificate
Equipment Operating Certificate · EQP-SI-08709 · Site - Equipment
May 6, 2024Permit
Permit · 6691365-PH · Phased Project Permit
May 6, 2024Record Snapshot
Record Snapshot · 6691365-PH-013 · Renewal Request
May 6, 2024Record Snapshot
Record Snapshot · 6691365-PH-013 · Renewal Request
Jan 22, 2024Optional Applicant Upload
Optional Applicant Upload · 6691365-PH · Phased Project Permit
Jan 22, 2024Optional Applicant Upload
Optional Applicant Upload · 6691365-PH · Phased Project Permit
Jan 22, 2024Optional Applicant Upload
Optional Applicant Upload · 6691365-PH · Phased Project Permit
Jan 22, 2024Optional Applicant Upload
Optional Applicant Upload · 6691365-PH · Phased Project Permit
Dec 26, 2023Statement of Financial Responsibility/Agent Authorization
Statement of Financial Responsibility/Agent Authorization · 6691365-PH · Phased Project Permit
Dec 26, 2023Pre-Submittal Conference/Coaching Application
Pre-Submittal Conference/Coaching Application · 6691365-PH · Phased Project Permit
Jun 13, 2023Equipment Operating Certificate
Equipment Operating Certificate · EQP-SI-08709 · Site - Equipment
Jun 1, 2023Equipment Inspection Corrections
Equipment Inspection Corrections · EQP-SI-08709 · Site - Equipment
May 30, 2023Site Invoice
Site Invoice · EQP-SI-08709 · Site - Equipment
Feb 3, 2023Inspection Report
Inspection Report · EQP-SI-08709 · Site - Equipment
Aug 29, 2022Equipment Operating Certificate
Equipment Operating Certificate · EQP-SI-08709 · Site - Equipment
Aug 29, 2022Equipment Operating Certificate
Equipment Operating Certificate · EQP-SI-08709 · Site - Equipment
Aug 29, 2022Equipment Operating Certificate
Equipment Operating Certificate · EQP-SI-08709 · Site - Equipment
Aug 29, 2022Equipment Operating Certificate
Equipment Operating Certificate · EQP-SI-08709 · Site - Equipment
Aug 29, 2022Equipment Operating Certificate
Equipment Operating Certificate · EQP-SI-08709 · Site - Equipment
Aug 29, 2022Equipment Operating Certificate
Equipment Operating Certificate · EQP-SI-08709 · Site - Equipment
Aug 16, 2022Permit
Permit · 6691365-PH · Phased Project Permit
Aug 11, 2022Inspection Report
Inspection Report · EQP-SI-08709 · Site - Equipment
Aug 30, 2021Equipment Operating Certificate
Equipment Operating Certificate · EQP-SI-08709 · Site - Equipment
Aug 3, 2021Equipment Operating Certificate
Equipment Operating Certificate · EQP-SI-08709 · Site - Equipment
Aug 3, 2021Equipment Operating Certificate
Equipment Operating Certificate · EQP-CY-07977 · Conveyance Equipment Certification