Seattle Skyward

2704 S Hinds St

Data updated November 27, 2026, 4:50 PM PT

Neighborhood: Rainier Valley

Withdrawn

About this project

First filed in September 2008, the address at 2704 S Hinds St in Columbia City, Seattle, has seen repeated apartment schemes, and the current structured program is a 4-story building with 45 units, 37 small efficiency dwelling units and 8 apartments, with no parking. The earliest filing (3009548-LU) was a boundary adjustment, canceled in 2011. A later streamlined design review scheme proposed 16 efficiency units in 6,900 square feet (3027546-LU), before the 45-unit scheme arrived under 3030173-LU with administrative design review (3032338-EG).

Latest activity

Oct 15, 2026 update

The newest document in the file is a cancellation or refund request for the 45-unit application (3030173-LU) dated October 2026. That application stands withdrawn, as does the earlier 16-unit scheme (3027546-LU), and no construction filings followed any of the schemes at the site.

Timeline

Permits

3030173-LUMaster UseWithdrawn
Land Use application to allow a 4-story, 45-unit apartment building (37 small efficiency dwelling units and 8 apartment units). No parking proposed. Existing building to be demolished. Administrative Design Review conducted under 3032338-EG.
3032338-EGEarly Design GuidanceCompleted
Administrative Design Review for a 4-story, 45-unit apartment building (37 small efficiency dwelling units and 8 apartment units). No parking proposed. Existing building to be demolished.
6670148-EXCompleted
COMBINE 2704 S HINDS ST & VACANT LOT TO THE NORTH. DEMO EXISTING HOUSE AT 2704 S HINDS ST. PROPOSED 4 STORY APARTMENT WITH A BASEMENT. APARTMENTS WILL HOUSE (40) SEDU UNITS. NO PARKING WILL BE PROVIDED.
3027546-LUMaster UseWithdrawn
PROJECT DESCRIPTION: STREAMLINED DESIGN REVIEW FOR A 6,900 GROSS SQUARE FOOT, 16 SEDU APARTMENT BUILDING WITH 4 STORIES AND A DAYLIGHT BASEMENT.
3009548-LUMaster UseCanceled
PROJECT CANCELED 6/1/2011 - ECON Land use application to adjust the boundary between two parcels of land. Proposed parcel sizes are: A)4,945.7 sq. ft. B)3,841 sq. ft. Existing Single Family Residence to remain.

Documents

60 documents tracked here, newest first, of 63 on file with the city.
Oct 15, 2026Cancellation or Refund Request
Cancellation or Refund Request · 3030173-LU · Withdrawal Request - Permits
Jun 1, 2025Billing Invoice
Billing Invoice · 3030173-LU · Master Use Permit
Feb 14, 2025Billing Invoice
Billing Invoice · 3032338-EG · Early Design Guidance
Jun 1, 2021Billing Invoice
Billing Invoice · 3030173-LU · Master Use Permit
May 3, 2021Design Review correspondence
Design Review correspondence · 3030173-LU · Master Use Permit
May 1, 2021Billing Invoice
Billing Invoice · 3030173-LU · Master Use Permit
Apr 1, 2021Billing Invoice
Billing Invoice · 3030173-LU · Master Use Permit
Mar 22, 2021Correction Letter
Correction Letter · 3030173-LU · Master Use Permit
Mar 19, 2021Vesting Confirmation
Vesting Confirmation · 3030173-LU · Master Use Permit
Mar 3, 2021Correction Letter
Correction Letter · 3030173-LU · Master Use Permit
Mar 3, 2021Correction Letter
Correction Letter · 3030173-LU · Master Use Permit
Mar 3, 2021Correction Letter
Correction Letter · 3030173-LU · Master Use Permit
Mar 2, 2021Correction Letter
Correction Letter · 3030173-LU · Master Use Permit
Mar 2, 2021Correction Letter
Correction Letter · 3030173-LU · Master Use Permit
Feb 11, 2021Public Comment
Public Comment · 3030173-LU · Master Use Permit
Jan 18, 2021Record Snapshot
Record Snapshot · 3030173-LU · Master Use Permit
Jan 1, 2021Billing Invoice
Billing Invoice · 3030173-LU · Master Use Permit
Dec 1, 2020Billing Invoice
Billing Invoice · 3030173-LU · Master Use Permit
Nov 23, 2020Large Sign
Large Sign · 3030173-LU · Master Use Permit
Nov 23, 2020Large Sign
Large Sign · 3030173-LU · Master Use Permit
Nov 23, 2020Notice Map
Notice Map · 3030173-LU · Master Use Permit
Nov 23, 2020Design Review meeting notes
Design Review meeting notes · 3030173-LU · Master Use Permit
Nov 12, 2020SPU Solid Waste Approval Letter
SPU Solid Waste Approval Letter · 3030173-LU · Master Use Permit
Nov 1, 2020Billing Invoice
Billing Invoice · 3030173-LU · Master Use Permit
Oct 29, 2020Site Plan
Site Plan · 3030173-LU · Application Intake
Oct 29, 2020SEPA Checklist
SEPA Checklist · 3030173-LU · Application Intake
Oct 29, 2020Traffic Report
Traffic Report · 3030173-LU · Application Intake
Oct 29, 2020Plan Set - Land Use
Plan Set - Land Use · 3030173-LU · Application Intake
Oct 29, 2020Geotechnical Report
Geotechnical Report · 3030173-LU · Application Intake
Oct 29, 2020Arborist Report
Arborist Report · 3030173-LU · Application Intake
Oct 29, 2020Statement of Financial Responsibility/Agent Authorization
Statement of Financial Responsibility/Agent Authorization · 3030173-LU · Application Intake
Feb 16, 2020Billing Invoice
Billing Invoice · 3032338-EG · Early Design Guidance
Jan 14, 2019Public Comment
Public Comment · 3032338-EG · Early Design Guidance
Oct 9, 2018Early Design Guidance (EDG) Meeting Report
Early Design Guidance (EDG) Meeting Report · 3032338-EG · Early Design Guidance
Sep 18, 2018Public Comment
Public Comment · 3032338-EG · Early Design Guidance
Sep 18, 2018Public Comment
Public Comment · 3032338-EG · Early Design Guidance
Aug 17, 2018Design Review Proposal cover page
Design Review Proposal cover page · 3032338-EG · Early Design Guidance
Aug 14, 2018Streamlined Design Review (SDR) Report
Streamlined Design Review (SDR) Report · 3032338-EG · Early Design Guidance
Jul 24, 2018Design Review Proposal cover page
Design Review Proposal cover page · 3032338-EG · Early Design Guidance
Jul 24, 2018Design Review Proposal
Design Review Proposal · 3032338-EG · Early Design Guidance
Jul 17, 2018Statement of Financial Responsibility/Agent Authorization
Statement of Financial Responsibility/Agent Authorization · 3032338-EG · Upload Documents
Jul 17, 2018Correction Response
Correction Response · 3032338-EG · Upload Documents
Jul 17, 2018Correction Response
Correction Response · 3032338-EG · Upload Documents
Jul 17, 2018Design Review Proposal
Design Review Proposal · 3032338-EG · Upload Documents
Jul 10, 2018Record Snapshot
Record Snapshot · 3032338-EG · Early Design Guidance
Jul 10, 2018Results Letter
Results Letter · 6670148-EX · ECA and Shoreline Exemption/Street Improvement Exception Request
Jul 3, 2018Notice Map
Notice Map · 3032338-EG · Early Design Guidance
Jul 2, 2018Statement of Financial Responsibility/Agent Authorization
Statement of Financial Responsibility/Agent Authorization · 3032338-EG · Upload Documents
Jul 2, 2018Design Review Proposal
Design Review Proposal · 3032338-EG · Upload Documents
Jul 2, 2018Pre-Submittal-Approved Notes/Minutes
Pre-Submittal-Approved Notes/Minutes · 3032338-EG · Early Design Guidance
Jun 12, 2018Billing Invoice
Billing Invoice · 3030173-LU · Master Use Permit
May 24, 2018Street Improvement Exception Request
Street Improvement Exception Request · 6670148-EX · ECA and Shoreline Exemption/Street Improvement Exception Request
May 24, 2018Record Snapshot
Record Snapshot · 6670148-EX · ECA and Shoreline Exemption/Street Improvement Exception Request
Apr 28, 2018Preliminary Assessment Report
Preliminary Assessment Report · 3030173-LU · Master Use Permit
Apr 28, 2018Preliminary Assessment Report
Preliminary Assessment Report · 3027546-LU · Master Use Permit
Apr 3, 2018Approved Pre-submittal Minutes Pre-Submittal-Approved Notes/Minutes
Approved Pre-submittal Minutes Pre-Submittal-Approved Notes/Minutes · 3030173-LU · Master Use Permit
Jan 26, 2018Pre-Submittal-Conference Notes
Pre-Submittal-Conference Notes · 3030173-LU · Master Use Permit
Jan 19, 2018Application Materials-General
Application Materials-General · 3030173-LU · Master Use Permit
Jan 19, 2018Financial Responsibility
Financial Responsibility · 3030173-LU · Master Use Permit
Dec 6, 2017Site Photos
Site Photos · 3030173-LU · Master Use Permit