The site at 5056 50th Ave S in Seattle's Seward Park neighborhood, first filed in October 2024, has carried a long sequence of 4-story schemes. An early mixed-use design with retail, 77 apartments, and 214 parking spaces was canceled in 2011, and a later version with 14 units was also canceled. Subsequent filings proposed a mixed-use building with 86 apartments and 7 live-work units, then a 93-unit assisted living building, both withdrawn. The current filings describe a courtyard building with about 117 units and 6,280 square feet of retail over below-grade parking (3040572-LU), alongside a 38-unit townhouse filing (3041776-LU).

Latest activity

Feb 18, 2025 update

A construction permit (7018905-CN) for two new multifamily buildings was filed in September 2024 and remains in corrections. A boundary adjustment application (3042138-LU) filed in October 2024 has completed its reviews, while the two building applications (3040572-LU and 3041776-LU) remain open with additional information requested. The last activity in the record is February 2025.

Timeline

Permits

3004929-EGEarly Design GuidanceCanceled
Early Design Guidance for: PROJECT CANCELLED 1/6/2011 -- Design review, early design guidance meeting to demolish existing structures and construct new mixed use structure containing 32,360 sq.ft.retail at street level; 77 residential units and 214 parking spaces within the structure.
3004929-LUMaster UseCanceled
PROJECT CANCELLED 1/6/2011 -- Design review, early design guidance meeting to demolish existing structures and construct new mixed use structure containing 32,360 sq.ft.retail at street level; 77 residential units and 214 parking spaces within the structure.
3010664-EGEarly Design GuidanceCanceled
Early Design Guidance for: PROJECT CANCELLED -- ON HOLD 7/5/2011 Demolition of existing structures. Construction of a new mixed-use structure with 23,000 sf retail space, 14 dwelling units with 88 parking spaces.
3010664-LUMaster UseCanceled
PROJECT CANCELLED -- ON HOLD 7/5/2011 Demolition of existing structures. Construction of a new mixed-use structure with 23,000 sf retail space, 14 dwelling units with 88 parking spaces.
3026573-LUMaster UseCanceled
Paid Coaching Request
3036090-EGEarly Design GuidanceWithdrawn
The proposed project is for a 4 story mixed-use building with +/- 12,000 sf of retail, 7 live work units, and 86 apartment units. Parking for 124 vehicles in a one level, below grade parking structure.
3036115-LUMaster UseWithdrawn
The proposed project is for a 4 story mixed-use building with +/- 12,000 sf of retail, 7 live work units, and 86 apartment units. Parking for 124 vehicles in a one level, below grade parking structure.
3036662-EGEarly Design GuidanceInitiated
EDG Construct 4-story over underground parking, 93-unit Assisted Living building on a 34,838sf site.
3036737-LUMaster UseWithdrawn
EDG Construct 4-story over underground parking, 93-unit Assisted Living building on a 34,838sf site.
3040572-LUMaster UseAdditional Info Requested
Application to allow a 4-story mixed-use building arranged around an interior courtyard with approximately 117 dwelling units, 6,280 sf of retail and one level of below-grade parking. 1/30/23 KU - Applicant requested that they will need LU for MUP/Pre-sub conference.
3041776-LUMaster UseAdditional Info Requested
38 Townhouse units
3042138-LUMaster UseReviews Completed
Land Use Application to adjust the boundary between three parcels of land. Existing building to remain.
7018905-CNConstructionCorrections Required
Construct west building occupy per plan. (Construct two new multi-family buildings occupy per plan. Review and processing for two records under 7018905-CN) Mechanical included this permit

Documents

City documents for this project's records are filed at Seattle EDMS:
3004929-EG
3004929-LU
3010664-EG
3010664-LU
3026573-LU
3036090-EG
3036115-LU
3036662-EG
3036737-LU
3040572-LU
3041776-LU
3042138-LU
7018905-CN