In Columbia City, Seattle, 5256 Rainier Ave S is a proposed 6-story mixed-use building with apartments over retail. The project required rezoning an 18,423-square-foot portion of the site from a 40-foot to a 65-foot height limit, on land in an environmentally critical area. Early design guidance (3025493-EG) put the scheme at 81 units with 7,300 square feet of retail and parking for 71 vehicles inside the structure. The Master Use Permit (3025493-LU) reduced the count to 73 units while proposing parking for 74 vehicles and demolition of the existing structures.

Latest activity

Apr 3, 2024 update—

Compliance and follow-up inspection documents for a violation record (1054412-VB) dated April 2024 are the latest items in the file. The month before, a permit was documented for the phased project record (6628112-PH) and a side sewer permit (7015041-SS) was recorded. That phased record, the Master Use Permit (3025493-LU), and the related demolition and shoring records all stand expired, leaving the mixed-use scheme unbuilt.

Permits

6649029-DMDemolitionExpired
Demolish three commercial structures subject to field inspection (STFI).
6628112-PHPhasedExpired
Phased project: Construct mixed use building with below grade parking occupy per plan.
6649028-CNConstructionExpired
Shoring and excavation for future construction of an apartment building with below grade parking per plan.
3025493-LUMaster UseExpired
Council Land Use Action to rezone 18,423 sq. ft. portion of land from Neighborhood Commercial 2 with a 40 ft. height limit (NC2-40) to Neighborhood Commercial 2 with a 65 ft. height limit (NC2-65 (M)). Project includes a 6-story, 73-unit apartment building with retail. Parking for 74 vehicles proposed. Existing structures to be demolished.
3025493-EGEarly Design GuidanceCompleted
Early Design Guidance for: Council Land Use Action to rezone 18,423 sq. ft. portion of land from Neighborhood Commercial 2 with a 40' height limit (NC2-40') to Neighborhood Commercial 2 with a 65' height limit (NC2-65'). Project includes a 6-story, 81 unit apartment building with 7,300 sq. ft. of retail in an environmentally critical area. Parking for 71 vehicles within the structure. Existing structures to be demolished.81 unit

Documents

54 documents tracked here, newest first — of 311 on file with the city.
Apr 3, 2024Compliance Letter
Compliance Letter · 1054412-VB · Vacant Building Monitoring
Apr 3, 2024Follow-up Inspection Report
Follow-up Inspection Report · 1054412-VB · Vacant Building Monitoring
Mar 19, 2024Record Snapshot
Record Snapshot · 7015041-SS · Side Sewer Permit
Mar 19, 2024Permit
Permit · 7015041-SS · Side Sewer Permit
Mar 19, 2024Record Snapshot
Record Snapshot · 7015041-SS · Side Sewer Permit
Mar 19, 2024Record Snapshot
Record Snapshot · 7015041-SS · Side Sewer Permit
Mar 19, 2024Side Sewer As-Built Template
Side Sewer As-Built Template · 7015041-SS · Side Sewer Permit
Mar 14, 2024Rat Abatement Plan
Rat Abatement Plan · 6649029-DM · Demolition Permit
Mar 13, 2024Approved Cover Sheet
Approved Cover Sheet · 6628112-PH · Phased Project Permit
Mar 13, 2024Permit
Permit · 6628112-PH · Phased Project Permit
Mar 13, 2024Record Snapshot
Record Snapshot · 6628112-PH · Phased Project Permit
Feb 23, 2024Follow-up Inspection Report
Follow-up Inspection Report · 1054412-VB · Vacant Building Monitoring
Jan 11, 2024Emergency Order
Emergency Order · 1055514-VI · Notice of Violation
Jan 5, 2024Follow-up Inspection Report
Follow-up Inspection Report · 1054412-VB · Vacant Building Monitoring
Dec 8, 2023Follow-up Inspection Report
Follow-up Inspection Report · 1054412-VB · Vacant Building Monitoring
Nov 7, 2023Follow-up Inspection Report
Follow-up Inspection Report · 1054412-VB · Vacant Building Monitoring
Sep 29, 2023Follow-up Inspection Report
Follow-up Inspection Report · 1054412-VB · Vacant Building Monitoring
Aug 26, 2023Follow-up Inspection Report
Follow-up Inspection Report · 1054412-VB · Vacant Building Monitoring
Jul 28, 2023Follow-up Inspection Report
Follow-up Inspection Report · 1054412-VB · Vacant Building Monitoring
Jun 1, 2023Follow-up Inspection Report
Follow-up Inspection Report · 1054412-VB · Vacant Building Monitoring
May 3, 2023Permit
Permit · 6649028-CN · Construction Permit
Apr 28, 2023Follow-up Inspection Report
Follow-up Inspection Report · 1054412-VB · Vacant Building Monitoring
Apr 14, 2023Revision Letter
Revision Letter · 23DPD-006608 · Renewal Request
Apr 6, 2023Correction Response
Correction Response · 23DPD-006608 · Renewal Request
Apr 6, 2023Correction Response
Correction Response · 23DPD-006608 · Renewal Request
Mar 28, 2023Follow-up Inspection Report
Follow-up Inspection Report · 1054412-VB · Vacant Building Monitoring
Mar 21, 2023Correction Letter
Correction Letter · 23DPD-006608 · Renewal Request
Feb 24, 2023Record Snapshot
Record Snapshot · 23DPD-006608 · Renewal Request
Feb 22, 2023Permit
Permit · 6649029-DM · Demolition Permit
Feb 22, 2023Record Snapshot
Record Snapshot · 6649029-DM-002 · Renewal Request
Feb 22, 2023Follow-up Inspection Report
Follow-up Inspection Report · 1054412-VB · Vacant Building Monitoring
Jan 17, 2023Follow-up Inspection Report
Follow-up Inspection Report · 1054412-VB · Vacant Building Monitoring
Nov 30, 2022Follow-up Inspection Report
Follow-up Inspection Report · 1054412-VB · Vacant Building Monitoring
Oct 20, 2022Follow-up Inspection Report
Follow-up Inspection Report · 1054412-VB · Vacant Building Monitoring
Oct 19, 2022Grading Season Extension Decision
Grading Season Extension Decision · 6649028-CN · Construction Permit
Sep 22, 2022Grading Season Extension Request
Grading Season Extension Request · 6649028-CN · Construction Permit
Sep 22, 2022Site Plan
Site Plan · 6649028-CN · Construction Permit
Sep 22, 2022Schedule of Proposed Grading Work
Schedule of Proposed Grading Work · 6649028-CN · Construction Permit
Sep 22, 2022Grading Season Extension Request
Grading Season Extension Request · 6649028-CN · Construction Permit
Sep 22, 2022Signed Geotechnical Engineer Letter
Signed Geotechnical Engineer Letter · 6649028-CN · Construction Permit
Sep 9, 2022Follow-up Inspection Report
Follow-up Inspection Report · 1054412-VB · Vacant Building Monitoring
Sep 7, 2022Permit
Permit · 6649028-CN · Construction Permit
Aug 29, 2022Record Snapshot
Record Snapshot · 6919670-EL · Electrical Permit: Over the Counter
Aug 29, 2022Permit
Permit · 6919670-EL · Electrical Permit: Over the Counter
Aug 10, 2022Correction Response
Correction Response · 21DPD-032357 · Renewal Request
Aug 2, 2022Follow-up Inspection Report
Follow-up Inspection Report · 1054412-VB · Vacant Building Monitoring
Jun 24, 2022Initial Inspection Report
Initial Inspection Report · 1054412-VB · Vacant Building Monitoring
Aug 26, 2021Correction Letter
Correction Letter · 21DPD-032357 · Renewal Request
Aug 20, 2021Record Snapshot
Record Snapshot · 21DPD-032357 · Renewal Request
Aug 20, 2021Permit
Permit · 6649029-DM · Demolition Permit
Aug 20, 2021Record Snapshot
Record Snapshot · 6649029-DM-001 · Renewal Request
Feb 1, 2021Historical Microfilm Permit
Historical Microfilm Permit
Jul 24, 2020Correction Response
Correction Response · 6628112-PH · Phased Project Permit
Jul 23, 2020MHA-Commitment Letter
MHA-Commitment Letter · 6628112-PH · Phased Project Permit