About this project

A 6-story apartment building with 127 units, most of them small efficiency dwelling units, was proposed at 817 N 50th St in Fremont, Seattle, first filed in October 2019. Early design guidance (3035366-EG) carried that scheme, with parking for 34 vehicles and demolition of the existing buildings. Two companion Master Use filings (3033631-LU and 3033632-LU) described a different scheme of 20 townhomes over a below-grade garage with 14 stalls.

Latest activity

Jun 24, 2020 update

The most recent document is the early design guidance meeting report for 3035366-EG in June 2020. Both townhome Master Use filings, 3033631-LU and 3033632-LU, are recorded as withdrawn, and no construction followed.

Timeline

Permits

3035366-EGEarly Design GuidanceCompleted
Design Review Early Design Guidance for a 6-story, 127-unit apartment building (113 Small Efficiency Dwelling Units). Parking for 34 vehicles proposed. Existing buildings to be demolished.
3033631-LUMaster UseWithdrawn
CONSTRUCTION OF 20 TOWNHOMES AND BELOW GRADE PARKING GARAGE WITH 14 STALLS. INCLUDES DEMOLITION OF EXISTING STRUCTURES.
3033632-LUMaster UseWithdrawn
CONSTRUCTION OF 20 TOWNHOMES AND BELOW GRADE PARKING GARAGE WITH 14 STALLS. INCLUDES DEMOLITION OF EXISTING STRUCTURES.

Documents

21 documents tracked here, newest first.
Jun 24, 2020Billing Invoice
Billing Invoice · 3035366-EG · Early Design Guidance
Jun 22, 2020Early Design Guidance (EDG) Meeting Report
Early Design Guidance (EDG) Meeting Report · 3035366-EG · Early Design Guidance
Jun 3, 2020Public Comment
Public Comment · 3035366-EG · Early Design Guidance
Jun 3, 2020Public Comment
Public Comment · 3035366-EG · Early Design Guidance
May 28, 2020Public Comment
Public Comment · 3035366-EG · Early Design Guidance
May 11, 2020Design Review Proposal cover page
Design Review Proposal cover page · 3035366-EG · Early Design Guidance
May 11, 2020Design Review Proposal
Design Review Proposal · 3035366-EG · Early Design Guidance
Apr 28, 2020Design Review correspondence
Design Review correspondence · 3035366-EG · Early Design Guidance
Mar 20, 2020Public Comment
Public Comment · 3035366-EG · Early Design Guidance
Mar 20, 2020Public Comment
Public Comment · 3035366-EG · Early Design Guidance
Mar 17, 2020Optional Applicant Upload
Optional Applicant Upload · 3035366-EG · Early Design Guidance
Mar 12, 2020Correction Letter
Correction Letter · 3035366-EG · Early Design Guidance
Feb 5, 2020Record Snapshot
Record Snapshot · 3035366-EG · Early Design Guidance
Feb 4, 2020Notice Map
Notice Map · 3035366-EG · Early Design Guidance
Feb 3, 2020One-Line Drawing
One-Line Drawing · 3035366-EG · Upload Documents
Feb 3, 2020Statement of Financial Responsibility/Agent Authorization
Statement of Financial Responsibility/Agent Authorization · 3035366-EG · Upload Documents
Feb 3, 2020Design Review Proposal
Design Review Proposal · 3035366-EG · Upload Documents
Dec 20, 2019Department of Neighborhoods Community Outreach Package
Department of Neighborhoods Community Outreach Package · 3035366-EG · Early Design Guidance
Nov 27, 2019Pre-Submittal-Approved Notes/Minutes
Pre-Submittal-Approved Notes/Minutes · 3035366-EG · Early Design Guidance
Oct 2, 2019Statement of Financial Responsibility/Agent Authorization
Statement of Financial Responsibility/Agent Authorization · 3035366-EG · Early Design Guidance
Oct 2, 2019Pre-Submittal Conference/Coaching Application
Pre-Submittal Conference/Coaching Application · 3035366-EG · Early Design Guidance