A 13-story mixed-use building was proposed at 910 Boylston Ave on First Hill, Seattle, first filed in January 2017. The filings, early design guidance (3026978-EG) and a Master Use application (3026978-LU), paired the new building with a rezone request and demolition of the existing building; the record gives no unit count.
Latest activity
Apr 28, 2018 update
The Master Use application (3026978-LU) was withdrawn, and the last activity at the site was in April 2018. Nothing has been filed at the site since.
Timeline
- ProposedJan 16, 2017
- Last recorded activityApr 28, 2018
Permits
Rezone from HR to NC3P-160. Demolish Existing Building and Construct New 13 Story Mixed-Use Building.
Early Design Guidance for: Rezone from HR to NC3P-160. Demolish Existing Building and Construct New 13 Story Mixed-Use Building.
Documents
4 documents tracked here, newest first.
Apr 28, 2018Preliminary Assessment Report
Preliminary Assessment Report · 3026978-LU · Master Use Permit
Jan 27, 2017Site Photos
Site Photos · 3026978-LU · Master Use Permit
Jan 17, 2017Site Plan
Site Plan · 3026978-LU · Master Use Permit
Jan 16, 2017Site Plan
Site Plan · 3026978-LU · Master Use Permit