9400 Rainier Ave S
Data updated November 27, 2026, 4:50 PM PT
Neighborhood: Rainier Valley
Completed
About this project
First filed in October 2006, the site at 9400 Rainier Ave S in Seattle's Dunlap neighborhood eventually produced a 5-story apartment building with 306 units, ground-floor retail, and parking for 146 vehicles. The first scheme, a restaurant building beside a 32-unit residential building, was canceled in 2010, and a later 70-townhome filing was withdrawn. The built scheme returned through design review under 3033563-EG, which described 330 units, before its Master Use Permit (3033410-LU) was issued in October 2019 at 306 units.
Latest activity
May 31, 2022 update
The project was completed in May 2022, when a certificate of occupancy was issued for the phased construction record (6743483-PH). Temporary certificates of occupancy had been granted in January and April 2022. The phased permit was issued in January 2020, and construction is documented by 141 special-inspection reports, the most recent dated January 2022.
Timeline
- ProposedNov 5, 2007
- Construction startedJan 23, 2020
- CompletedMay 31, 2022
Permits
Phased permit: Construct mixed-use residential building with ground floor commercial and below grade parking occupy per plan.
Early Design Guidance for: Canceled for failure to respond to ECON 3-8-2010 sgp Land Use Application to allow a two-story, 21,671 sq. ft. restaurant building and a three-story residential building with 32 units and 4,745 sq. ft. of retail at ground level. Parking for 49 vehicles will be located within the residential structure at grade. Surface parking for 97 vehicles will also be provided on site. Review includes demolition of 5,681 sq. ft. restaurant building.
Canceled for failure to respond to ECON 3-8-2010 sgp Land Use Application to allow a two-story, 21,671 sq. ft. restaurant building and a three-story residential building with 32 units and 4,745 sq. ft. of retail at ground level. Parking for 49 vehicles will be located within the residential structure at grade. Surface parking for 97 vehicles will also be provided on site. Review includes demolition of 5,681 sq. ft. restaurant building.
EDG - New construction of 70 townhomes, approximately 1600 sf each with 70 parking spaces total. REVISED FROM:. EDG - Construct 55,109 sq. ft. mixed use buildings with320 units and 270 parking spaces. REVISED FROM: Mixed use project with 320 units, 4,000 SF commercial. Parking for 270 cars will be located in structure.
Land Use Application to allow a 5-story, 306-unit apartment building with general retail sales and services. Parking for 146 vehicles proposed. Existing buildings to be demolished. Early Design Guidance Review conducted under 3033563-EG.
Administrative Design Review for a 5-story, 330-unit apartment building with retail. Existing building to be demolished. Parking for 228 vehicles provided. Project includes contract rezone.
Documents
60 documents tracked here, newest first, of 385 on file with the city.