Bevel, at 870 106th Ave NE in Bellevue's Downtown neighborhood, is a 12-story mass timber office building developed by Scd 106th Ne LLC. Its design review (25 125926 LD) describes about 129,000 square feet of office space over below-grade parking, with ground-floor retail and active uses. The project entered the record at a preapplication conference (24 116329 DB) in 2024, on the 10651 NE 9th Pl lot.
Post revision 1: Haul Route Only For: Bevel Construction "MAZEN"
9 utility potholes, 2 lid structure openings and 2 vent structure openings Lid structure openings is based on lids being allowed to be accessed by others all in one simultaneous mobilization., 26-11
Construction of a129,000SF, 9-story new mass timber construction office building in Downtown Bellevue. The proposal includes four floors below grade parking in a concrete garage and ground floor active use/ retail, 24 111384 DC
Construction of a129,000SF, 9-story new mass timber construction office building in Downtown Bellevue. The proposal includes four floors below grade parking in a concrete garage and ground floor active use/ retail.
Construction of a129,000SF, 9-story new mass timber construction office building in Downtown Bellevue. The proposal includes four floors below grade parking in a concrete garage and ground floor active use retail., 24 111384 DC
DC application for structural peer review, 25 125926 LD
Smoke control for new 129,000SF, 9-story new mass timber construction office building in Downtown Bellevue., 25 125926 LD
Shoring for new a129,000SF, 9-story new mass timber construction office building in Downtown Bellevue. The proposal includes four floors below grade parking in a concrete garage and ground floor active use retail., 25 125926 LD
Underground fire service for new a129,000SF, 9-story new mass timber construction office building in Downtown Bellevue. The proposal includes four floors below grade parking in a concrete garage and ground floor active use retail., 25 125926 LD
Utility extensions for new a129,000SF, 9-story new mass timber construction office building in Downtown Bellevue. The proposal includes four floors below grade parking in a concrete garage and ground floor active use retail., 25 125926 LD
Phase 1 - Clear and grade for early works and mass ex for new a129,000SF, 9-story new mass timber construction office building in Downtown Bellevue. The proposal includes four floors below grade parking in a concrete garage and ground floor active use retail., 25 125926 LD
Boundary Line Adjustment for new construction of a129,000SF, 9-story new mass timber construction office building in Downtown Bellevue., 25 125926 LD
Phase 1 - Below grade permit for new 12 story office tower to include 5 below-grade levels of foundation for subsurface parking, up to an including Level 1., 25 125926 LD
Phase 2 - Above grade - Levels 2-12 of office tower including penthouse and occupied roof terrace, 25 125926 LD
Phase 2 Clear and Grade for new 9-story new mass timber construction office building in Downtown Bellevue. The proposal includes four floors below grade parking in a concrete garage and ground floor active use retail., 25 125926 LD
Plumbing for new 9-story new mass timber construction office building in Downtown Bellevue. The proposal includes four floors below grade parking in a concrete garage and ground floor active use retail., 25 125926 LD
Mechanical for new 12 story office tower to include 5 below-grade levels of foundation for subsurface parking., 26 117718 BB
Electrical for new 9-story new mass timber construction office building in Downtown Bellevue. The proposal includes four floors below grade parking in a concrete garage and ground floor active use retail., 26 117722 BB