10777 NE 10th St
Data updated November 27, 2026, 4:50 PM PT
Neighborhood: Downtown Bellevue
- Stories6
- Latest activityNov 13, 2018
About this project
The 6-story hotel at 10777 NE 10th St in Downtown Bellevue sits over a 2-level below-grade parking structure, with a fitness center, swimming pool, and spa in the upper levels. The site began differently: a 2013 preapplication conference (13 115805 DB) covered apartments, townhomes, retail, and office space, before a second conference in July 2014 (14 137933 DB) turned to a hotel. The hotel scheme won its design review (14 140942 LD), filed in September 2014 and issued that October, and construction was split between a garage and first-floor permit (14 147490 BB) and a permit for the remaining 5 levels (14 147489 BB).
Latest activity
Nov 13, 2018 update
Both hotel construction permits (14 147489 BB and 14 147490 BB) closed in November 2018, the project's completion date. No later filings appear in the record.
Timeline
- ProposedMay 29, 2013
- Construction startedJul 14, 2015
- CompletedNov 13, 2018