11162 NE 10th St
Data updated November 27, 2026, 4:50 PM PT
Neighborhood: Downtown Bellevue
- Stories23
- Latest activityApr 6, 2022
About this project
The mixed-use project at 11162 NE 10th St in Downtown Bellevue pairs a 23-story residential tower with a 7-story midrise building, together holding 260 apartments over a 2-story retail podium and 5 stories of below-grade parking. A preapplication conference (15 126082 DB) in October 2015 introduced the scheme, and the design review (16 127213 LD) was filed in March 2016 and issued in April 2017. Later exemption filings put the count at 259 units; the record's counted program is 260.
Latest activity
Apr 6, 2022 update
The newest filing is a land use exemption for a new bakery and cafe (22 103995 LJ), issued in April 2022. The project was completed in May 2021, when the above-grade construction permit (17 105647 BB) closed; the below-grade garage permit (16 136606 BB) had closed the month before.
Timeline
- ProposedOct 30, 2015
- Construction startedJul 11, 2017
- CompletedMay 21, 2021