121 112th Ave NE - Unit Site

Data updated November 27, 2026, 4:50 PM PT

Neighborhood: Downtown Bellevue

Completed

About this project

The Holden of Bellevue at 121 112th Ave NE in Downtown Bellevue is a 7-story assisted living and memory care community with 136 units over 1 story of below-grade parking. A preapplication conference (18 110958 DB) in April 2018 set out the scheme, and the design review (18 116053 LD) was filed in June 2018 and issued in April 2019. The construction permit (19 103339 BB) was filed in January 2019, with shoring (18 133284 BV) and grading (18 133300 GD) permits filed the previous December.

Latest activity

Jun 22, 2022 update

The construction permit (19 103339 BB) closed in June 2022, the project's completion date. The last earlier movement was a land use exemption (20 119904 LJ), issued in April 2021, revising the through-block connection at the property line in favor of a private resident courtyard.

Timeline

Permits

18 110958 DBPreapplication ConferenceClosed
7 story residential (assisted living and memory care) over 1 story of below-grade parking
18 116053 LDDesign ReviewClosed
Assisted living community. King Co. Recording 20220418000958
18 133284 BVShoring PermitClosed
Shoring associated with the new construction of a 7-story, 136 Senior Housing building. Includes 1 level of underground parking.
18 133300 GDClearing & GradingClosed
The project proposes to construct a near zero lot line 7-story mixed use building. The building will be a senior assisted living facility and memory care community.There will be underground parking and associated sidewalk and landscape improvements in the ROW.
19 103339 BBMajor Commercial Project Closed
136 Unit Memory Care and Assisted Living Facility with below grade parking
20 119904 LJLand Use ExemptionClosed
Alliance Residential will be developing the parcel to the south of the Holden of Bellevue project at 121 112th Avenue NE. The new project to the south will revise grades at the property line and provide an alternative through-block connection which leads to the through-block connector stairs and accessible lift provided on the Holden of Bellevue site. We are proposing a modification to our drawings to accommodate this new connection, removing the through block connector on our site that leads to the stairs. This area would be converted into a private courtyard for residents.

Documents

Bellevue does not publish permit documents. Permit records are at MyBuildingPermit.