Redevelopment of existing site to include demolition of four existing building, construction of a multi-story Public Storage building and associated site improvements. Wednesday May 13, 2015 - 1:30pm
The proposed design improves overall density on the site, in alignment of the City long term goal. The combined properties are proposed to be developed in two phases, to allow for continuous operation of the existing business, and to minimize the disruption to existing customers. In Phase 1, the three southernmost single-story structures on the south parcel, as well as the covered RV parking, would be replaced with a single, four-story internally-serviced mini-storage building, with a covered loading area provided by the overhanging third and fourth floor plates. Phase 2 would consist of renovation and rebranding of the current Rental Office, located on the northern parcel. The proposed Phase 1 building has an enclosed footprint of 45,123 sf (first and second floors), with floor plates at the third and fourth levels having 49,647 sf each, for a total area of 189,540 sf. The Phase 2 work would not increase or decrease the current footprint/area of that building. The floor area for the new building, in combination with the 106,800 sf of existing/remaining floor area across both parcels, totals 296,340 sf, and is within the maximum allowable building area for the combined properties., 19 126040
Proposed 4-story, 189,200 GSF internally-serviced self-storage building and associated site improvements, utilities, storm drainage, and frontage improvements along Northup Way. Three one-story storage buildings will be demolished to make room for the new building. Critical areas are located to the west and south of the subject site., 19-126040-LP, 19128994-LD.
5/28/26 The applicant will be cancelling this DB and proceeding with a Land Use Exemption.
LUX related to changes to the project due to the street improvement design for 124th Avenue was understood to have an impact on the project; however, the final condition included construction of a new driveway, ramp and retaining wall at the SE corner of the property. These as-built conditions required changes to the building footprint and site plan., 19-128994-LD
Clear and Grade for new four-story internally-serviced mini-storage building, with a covered loading area provided by the overhanging third and fourth floor plates., 19 128994 LD