180 Bellevue Way NE
Data updated November 27, 2026, 4:50 PM PT
Neighborhood: Downtown Bellevue
- Stories21
- Latest activitySep 29, 2021
About this project
A 21-story residential tower with 143 units and 3 levels of underground parking stands at 180 Bellevue Way NE in downtown Bellevue. The design review (15 124509 LD), filed in September 2015 and issued in September 2016, described a residential mixed-use project. Construction was split between an underground garage permit (16 134210 BB) and a separate above-grade permit (16 146249 BB) for the tower itself, with shoring and excavation permits filed alongside in June 2016.
Latest activity
Sep 29, 2021 update
The tower was completed in September 2021, when both the garage permit (16 134210 BB) and the above-grade permit (16 146249 BB) closed. Shoring (16 134197 BV) had closed in May 2021. The last smaller filing was a land use exemption (20 103826 LJ), closed in March 2020, covering a change of use for the level 1 retail space.
Timeline
- ProposedSep 28, 2015
- Construction startedMar 15, 2017
- CompletedSep 29, 2021