About this project

The site at 1899 116th Ave NE in Bellevue's BelRed neighborhood was first pursued as a 1-story medical clinic over an open parking garage, through a design review (13 111934 LD) in 2013; its building and grading permits were canceled in April 2014. The scheme that replaced it is a 6-story assisted living community with 118 units, amenity spaces and 1 story of below-grade parking, filed in 2017 in 2 phases, below grade first and the building above it second.

Latest activity

Sep 29, 2022 update

The most recent filing is a land use exemption (22 112761 LJ) for 3 sectors of rooftop cell antennas, closed in September 2022. The assisted living building was completed in December 2020, when both phase permits (17 120369 BB and 17 120370 BB) closed; its shoring permit (18 108241 BV) closed the same week.

Timeline

Permits

12 104235 DBPreapplication ConferenceClosed
Preapp 1/20/2012 regarding a medical office.
13 111934 LDDesign ReviewClosed
Demolish existing single family residences. Combine both lots on signle parcel. Construct one story medical clinic building over open parking garage located on grade.
13 122325 BBMajor Commercial Project Canceled
Demo existing single family residences that are currently a medical clinic/day care on lots 5 & 6. Combine lots 5 & 6 and construct a one story medical clinic building over open parking garage located on grade.
13 122327 GDClearing & GradingCanceled
Clearing and grading for new medical building.
17 120098 GDClearing & GradingClosed
Clearing and grading associated with new senior living building. Construction of new utilities, sidewalks, stormwater control facilities, parking, landscaping, and road restoration.
17 120369 BBMajor Commercial Project Closed
PHASE II OF II: PHASE II IS ABOVE GRADE BUILDING: 6 STORY ASSISTED LIVING COMMUNITY WITH AMENITY SPACES AND 1 STORY OF BELOW GRADE PARKING.
17 120370 BBMajor Commercial Project Closed
PHASE I OF II: PHASE I IS P1 ONLY: 6 STORY ASSISTED LIVING COMMUNITY WITH AMENITY SPACES AND 1 STORY OF BELOW GRADE PARKING.
18 108241 BVShoring PermitClosed
Temporary cantilevered steel soldier piles and wood lagging, and concrete block walls in support of the excavation for the Aegis Overlake senior living building project., 18-130313
22 112761 LJLand Use ExemptionClosed
Install 3 sectors of rooftop cell antennas (11 total antenna)

Documents

Bellevue does not publish permit documents. Permit records are at MyBuildingPermit.