320 108th Ave NE
Data updated November 27, 2026, 4:50 PM PT
Neighborhood: Downtown Bellevue
- Stories17
- Latest activityNov 10, 2026
About this project
The office tower at 320 108th Ave NE in downtown Bellevue began as a 15-story office building over an existing 7-level below-grade parking structure (10 106707 BB); that permit was issued in December 2012 and later expired. The scheme returned in 2017 with a design review (17 113353 LD) and was built as a 17-story office and retail building of about 372,000 square feet over the existing parking structure, under a new building permit (17 127782 BB).
Latest activity
Nov 10, 2026 update
A land use exemption (26 126363 LJ) for removing an ATM, its surround and signage and returning the wall to a blank configuration was filed in November 2026 and is in completeness check. The office building was completed in July 2021, when its building permit (17 127782 BB) closed.
Timeline
- ProposedMar 15, 2010
- Construction startedDec 21, 2012
- CompletedJul 28, 2021