500 Bellevue Way NE
Data updated November 27, 2026, 4:50 PM PT
Neighborhood: Downtown Bellevue
- Latest activityJul 6, 2022
About this project
The Lincoln Square Expansion at 500 Bellevue Way NE in downtown Bellevue was built from the ground down first: a below-grade parking structure of levels P1 to P6 (12 121840 BB), excavation and shoring permits, and then construction of the expansion podium (14 125999 BB). A tunnel below grade connects the expansion to the original Lincoln Square, permitted in November 2014 (14 144700 BM).
Latest activity
Jul 6, 2022 update
The most recent filing is a land use exemption (22 101291 LJ) for surface window graphics, closed in July 2022. The record's completion date is April 2018, when the tunnel permit (14 144700 BM) closed; the podium and parking permits had closed in March 2018.
Timeline
- ProposedAug 15, 2012
- Construction startedMar 14, 2014
- CompletedApr 20, 2018