Bellevue 600, at 600 108th Ave NE in downtown Bellevue, began as a Master Development Plan (16 122461 LP) for a 34-story office tower and a 41-story, 500-room hotel over shared above-grade and below-grade parking garages, next to the existing Bellevue Corporate Plaza building. A revised plan (20 101468 LP) recast the project as 2 office towers with a meeting center, commons space and retail in phases. Phase 2, on the west side of the site, puts its office tower over a garage permitted first.
Replace metal stairs in parking garage.
Provide new front and rear canopies, resurface SW parking area, new and revised landscape and hardscape SW site.
September 2nd 2015 @ 3:00pm
Remove existing front & rear canopies for new front & rear canopies per plan. Minor revisions to the asphalt parking and reseal all paving in the front. New landscaping for beautification.
Bellevue 600 is a proposed Master Development Plan (MDP) for a two building mixed-use development conceived to work in concert with the existing ten-story Bellevue Corporate Plaza Building. The new development is comprised of an approximately 800,000 GSF, 34 story, 450 ft tall commercial office building and a 491,000 GSF, 41 story, 437 ft tall, and 500 key business hotel. Both towers are positioned above a four story 441 stall above ground parking garage and a seven level, 1578 stalls below grade parking garage. Retail shops and office building and hotel lobbies continuously surround the podium building at the street level. Also planned is landscaped garden and plaza located at grade between the towers and on the roof of the above grade parking garage podium.
This site lies between 108th Avenue NE and 110th Avenue NE to the north of the Bellevue Transit Center. The existing parcel includes the existing Bellevue Corporate Plaza site and it will be demised to create a new development site of approximately 90,000 SF on the East side of the existing site. A single 600' office tower with a podium including active uses will be constructed over a continuous underground parking garage.
Bellevue 600 - Phase One features a new office tower, meeting center, commons space, and retail uses at the northwest corner of 110th Avenue NE and NE 6th Street. The development is designed to welcome people into the city from the nearby Transit enter and Link Light Rail station as well as provide pedestrian connections to the north and west. The new building steps back from the Grand Connection along NE 6th Street and a new Major Public Open Space is created at the corner of 110th NE and the NE 6th Street. The open space and streetscape along both 110th Avenue NE and the NE 6th Street Pedestrian Corridor will be enlivened by retail and other active uses. A significant commons space in the middle of the block will create a landscaped pedestrian connection to the north and a place of respite for residents, commuters, and downtown workers., 19 118464 DB
Bellevue 600 features two new office towers, meeting center, commons space, and retail uses between 108th AVE NE 110th Avenue NE, North 6th Street. The development is designed to welcome people into the city from the nearby Transit enter and Link Light Rail station as well as provide pedestrian connections to the north and west. The new buildings steps back from the Grand Connection along NE 6th Street and a new Major Public Open Space is created at the corner of 110th NE and the NE 6th Street. The open space and streetscape along 108th Avenue NE, 110th Avenue NE and the NE 6th Street Pedestrian Corridor will be enlivened by retail and other active uses. A significant commons space in the middle of the block will create a landscaped pedestrian connection to the north and a place of respite for residents, commuters, and downtown workers., 19 131761 LD
Clear and grade for utility relocate work.
Primarily exterior site work in order to keep the Bellevue Corporate Plaza building operational during the demolition of the parking garage on the same site and construction of a new building in its place (Bellevue 600 Ph 1). The main elements are a new dumpster enclosure, re-striping the front parking lot, and altering the egress court at the north side of the building.
Land use modification for existing site.
Bellevue 600 - Phase 2 features a new office tower, retail spaces, and commons space at the northeast corner of 108th Avenue NE and NE 6th Street, located to the west of the Phase 1 tower currently undergoing Land Use reviews. Bellevue 600 is designed to welcome people and arrivals to the City via the new Link Light Rail station, Transit Center, and Grand Connection, as well as enhance the public plaza and pedestrian connections. The project will create a more active and engaging bicycle and pedestrian experience facing 108th Ave NE and the Grand Connection and Transit Center on NE 6th Street. Phase 2 will expand the significant commons space in the middle of the block started in Phase 1, creating a landscaped and publicly accessible pedestrian connection to the north, and a place of respite for residents, commuters, and workers.
Bellevue 600 Phase Two, along with Phase 1, will enrich downtown Bellevue with an office tower and inviting, activated open space at ground level. Located in the heart of the city and adjacent to both the Link Light Rail station and the Bellevue Transit Center, the site includes the existing Bellevue Corporate Plaza office building which will be demolished as part of this development. This project also includes an common areas and retail uses within its 4 story podium at the base of the building. The project is designed to welcome and connect people traveling to and from downtown Bellevue. It enhances the significant outdoor public plaza in the middle of the block and creates a vibrant pedestrian-friendly retail edge along NE 6th Street, which is part of The Grand Connection. The streetscape along 108th Avenue NE will also feature active retail and pedestrian-focused amenities intended to support neighboring residents, commuters and downtown workers. Bellevue 600 Phase Two, along with Phase 1, is designed to bring life to the downtown fabric of Bellevue.
Clear and grade for early utility work and mass excavation.
Construction of two office towers including garage and retail as well as site development
Construction of an office tower including retail and parking.
Shoring for mass excavation for new Phase 2 office tower, retail spaces, and commons space at the northeast corner of 108th Avenue NE and NE 6th Street, located to the west of the Phase 1 tower.
Clearing and Grading for new Phase 2 office tower, retail spaces, and commons space at the northeast corner of 108th Avenue NE and NE 6th Street, located to the west of the Phase 1 tower.
The project scope has been modified with the Pre3 submittal from the entire building (below & above grade) to now include only levels P6 to P2.
Construction of an office tower and associated site work.
Revised scope from permit 22 111278 BB to Cap building at top of garage., 22 111278 BB
** Re-Establishing Building Permit Application Vesting 23 109368 BB** Revised scope from permit 22 111278 BB to Cap building at top of garage
modification to amount of Purchased Bonus Floor Area and revisions to the parking stall mix in the Phase 2 garage to change 12 standard stalls to compact stalls on level P6
Final clear and grade for remaining phase 2 office tower with retail and common spaces.
Phase 2 Clear and grade for early utility work and mass excavation (21-115419 GD).
BB3 building permit includes the scope to construct the 31-story office tower on the Phase 2 garage currently in construction and permitted under the BB1 and BB2 permits described above. The BB3 permit will maintain the vesting to land use and building/energy codes.