75 102nd Ave NE
Data updated November 27, 2026, 4:50 PM PT
Neighborhood: Downtown Bellevue
- Stories6
- Latest activityJun 5, 2026
About this project
A 6-story mixed-use building at 75 102nd Ave NE in downtown Bellevue holds 150 apartments over ground-floor retail, with 3 levels of below-grade parking. Its design review (16 149182 LD) was filed in December 2016 and issued in November 2017. Construction split into 2 permits, 1 for the concrete structure through the 2nd floor deck with the parking, retail shell and 15 homes (17 117794 BB), and 1 for the residential portion above with 135 homes (17 118185 BB).
Latest activity
Jun 5, 2026 update
A permit (24 129876 BW) replacing the entrance awning closed in June 2026, the record's completion date. The building permits themselves closed in August 2020, and a rooftop amenity exemption (25 102711 LJ) for a changed pergola, grills and planters was completed in April 2025.
Timeline
- ProposedDec 23, 2016
- Construction startedJan 16, 2018
- CompletedJun 5, 2026