Seattle Skyward

219 E Galer St

Data updated November 27, 2026, 4:50 PM PT

Neighborhood: South Lake Union

Withdrawn
Presentation slide 1
Presentation: Design Review Proposal, Nov 16, 2016. Source: Seattle city records.1 / 18

About this project

First filed in May 2011, the proposal at 219 E Galer St in Seattle's South Lake Union neighborhood was a 6-story building with ground-level retail, residences above, and integrated structured parking, with the existing structure to be demolished. The scheme appeared in duplicate filings, records 3012341-EG and 3012341-LU alongside a near-identical pair, 3012350-EG and 3012350-LU, one of which specified modular alternative construction. No unit count was recorded for the building.

Latest activity

Apr 28, 2018 update

All 4 filings at the site stand canceled; the lead pair (3012341-EG and 3012341-LU) carries a cancellation note dated December 2011, months after filing. The record's last activity dates to April 2018, and the only later documents are design review proposals from November 2016 attached to the canceled records. No construction permit ever followed.

Timeline

Permits

3012341-LUMaster UseCanceled
PROJECT CANCELED 12/05/2011 Design Review Early Design Guidance application proposing a 6-story building containing ground-level retail with residential unit above and integrated structured parking. Existing structure to be demolished.
3012350-LUMaster UseCanceled
Design Review Early Design Guidance application proposing a 6-story building (MODULAR ALTERNATIVE construction type) containing ground-level retail with residential unit above and integrated structured parking. Existing structure to be demolished.
3012341-EGEarly Design GuidanceCanceled
Early Design Guidance for: PROJECT CANCELED 12/05/2011 Design Review Early Design Guidance application proposing a 6-story building containing ground-level retail with residential unit above and integrated structured parking. Existing structure to be demolished.
3012350-EGEarly Design GuidanceCanceled
Early Design Guidance for: Design Review Early Design Guidance application proposing a 6-story building (MODULAR ALTERNATIVE construction type) containing ground-level retail with residential unit above and integrated structured parking. Existing structure to be demolished.

Documents

7 documents tracked here, newest first.
Apr 28, 2018Preliminary Assessment Report
Preliminary Assessment Report · 3012341-LU · Master Use Permit
Nov 16, 2016Design Review Proposal
Design Review Proposal · 3012350-LU · Master Use Permit
Nov 16, 2016Design Review Proposal
Design Review Proposal · 3012341-LU · Master Use Permit
Jun 6, 2011Statement of Financial Responsibility/Agent Authorization
Statement of Financial Responsibility/Agent Authorization · 3012341-LU · Master Use Permit
May 9, 2011Application Materials-General
Application Materials-General · 3012341-LU · Master Use Permit
May 6, 2011Site Photos
Site Photos · 3012341-LU · Master Use Permit
May 5, 2011Site Plan
Site Plan · 3012341-LU · Master Use Permit