219 Terry Ave N

Data updated November 27, 2026, 4:50 PM PT

Neighborhood: South Lake Union

Withdrawn

About this project

The site at 219 Terry Ave N in Seattle's South Lake Union neighborhood, first filed in September 2005, holds 2 distinct proposals a decade apart. The original application (3003500-LU) ended as a repair and renovation of the existing building with a possible penthouse addition. The later scheme, filed in 2019 under records 3034939-LU, 3034940-LU, and design guidance record 3035115-EG, combined the parcels at 219 and 225 Terry Ave N, demolished the building at 219 while retaining the one at 225, and proposed a new 13-story office building with 3 stories of below-grade parking, entered in the Living Building Pilot Program.

Latest activity

Dec 2, 2019 update

All 3 filings for the office scheme, 3034939-LU, 3034940-LU, and 3035115-EG, stand withdrawn, and the record's last activity dates to December 2019. The newest documents are pre-submittal notes from December 2019 and a community outreach package from that September. The original 2005 application (3003500-LU) was canceled in December 2010, and no construction followed either proposal.

Timeline

Permits

3035115-EGEarly Design GuidanceWithdrawn
EDG - Combine parcels at 219 and 225 Terry Ave N. Demolish existing building at 219 Terry Ave N, retain existing building at 225 Terry Ave N. Construct new 13 story office building with three stories of below grade parking. This project is participating in the Living Building Pilot Program.
3034939-LUMaster UseWithdrawn
Combine parcels at 219 and 225 Terry Ave N. Demolish existing building at 219 Terry Ave N, retain existing building at 225 Terry Ave N. Construct new 13 story office building with three stories of below grade parking.
3003500-LUMaster UseCanceled
PROJECT CANCELLED 12/2/10 -- repair and renovate existing building, possible penthouse addition.(related const 6066826)
3034940-LUMaster UseWithdrawn
Combine parcels at 219 and 225 Terry Ave N. Demolish existing building at 219 Terry Ave N, retain existing building at 225 Terry Ave N. Construct new 13 story office building with three stories of below grade parking.

Documents

8 documents tracked here, newest first.
Dec 2, 2019Pre-Submittal-Approved Notes/Minutes
Pre-Submittal-Approved Notes/Minutes · 3035115-EG · Early Design Guidance
Sep 25, 2019Department of Neighborhoods Community Outreach Package
Department of Neighborhoods Community Outreach Package · 3035115-EG · Early Design Guidance
Aug 21, 2019Pre-Submittal Conference/Coaching Application
Pre-Submittal Conference/Coaching Application · 3035115-EG · Early Design Guidance
Aug 21, 2019Statement of Financial Responsibility/Agent Authorization
Statement of Financial Responsibility/Agent Authorization · 3035115-EG · Early Design Guidance
Aug 21, 2019Preliminary Assessment Report
Preliminary Assessment Report · 3035115-EG · Early Design Guidance
Aug 15, 2019Pre-Submittal Conference/Coaching Application
Pre-Submittal Conference/Coaching Application · 3034939-LU · Master Use Permit
Aug 15, 2019Statement of Financial Responsibility/Agent Authorization
Statement of Financial Responsibility/Agent Authorization · 3034939-LU · Master Use Permit
Sep 30, 2005Application Materials-General
Application Materials-General · 3003500-LU · Master Use Permit