First filed in February 2011, the project at 500 Fairview Ave N in Seattle's South Lake Union neighborhood is a 7-story laboratory and office building with 62,887 square feet of laboratory space and 41,924 square feet of office space over below-grade parking, tied into the existing building next door. The scheme required a contract rezone of 21,372 square feet of land and demolition of the existing building and surface parking lot. An earlier 5-story biotech proposal on the site (3003793-LU) was canceled in 2010.

Latest activity

Feb 18, 2016 update

The last movement in the family is a tenant-improvement construction permit (6433891-CN) for laboratory space, completed in February 2016. The phased construction permit (6254208-PH) was completed in December 2015, and a Property Use and Development Agreement amendment (3015121-LU) was issued in September 2014. No filings have followed since February 2016.

Timeline

Permits

3003793-LUMaster UseCanceled
PROJECT CENCELLED 12/20/10: MUP for construction of a 5 story biotech research and development bldg. Related to MUP: 2002080
3011479-EGEarly Design GuidanceCompleted
Early Design Guidance for: Council Land Use Action to contract rezone 21,372 sq. ft. of land from IC 65' to SM 85'. Project includes a seven-story building containing 62,887 sq. ft. of laboratory and 41,924 sq. ft. of office. Project also includes 29,260 cu. yds. of grading in an environmentally critical area and demolition of the existing building and surface parking lot on the site. Minor PUDA amendment under 3015121 approved by Council 8/5/2014 Ord.124258
3011479-LUMaster UseCompleted
Council Land Use Action to contract rezone 21,372 sq. ft. of land from IC 65' to SM 85'. Project includes a seven-story building containing 62,887 sq. ft. of laboratory and 41,924 sq. ft. of office. Project also includes 29,260 cu. yds. of grading in an environmentally critical area and demolition of the existing building and surface parking lot on the site. Minor PUDA amendment under 3015121 approved by Council 8/5/2014 Ord.124258
3015121-LUMaster UseCompleted
Request to amend a Property Use and Development Agreement (PUDA) that was required as an amendment of the Official Land Use Map, approved under Ordinance 123774, relating to Contract Rezone 3011479.
3027763-LUMaster UseWithdrawn
CRAN_RWOR_DTSEA_025 PROPOSE TO CONSTRUCT AN UNMANNED TELECOMMUNICATIONS FACILITY ON AN EXISTING SCL WOOD UTILITY POLE BY INSTALLING [1] CANISTER ANTENNA AND ASSOCIATED RADIO EQUIPMENT
6254208-PHPhasedCompleted
Phased project: Construction of a laboratory and office building with below grade parking and occupy per plan (includes tie-in into the existing structure at 530 Fairview Ave N under associated AP 6357057)
6339746-DMDemolitionCompleted
Demolish existing commerical bldg 21 600 sq ft. ( Down to slab) per plans.
6356939-CNConstructionCompleted
Shoring and excavation only for construction of a laboratory and office building with below grade parking per plan
6357057-CNConstructionCompleted
Alterations to existing commercial building to tie into new building at 500 Fairview Ave N per plan (routing for this AP under 6357059)
6433891-CNConstructionCompleted
Initial tenant improvements to research and development lab at fourth floor mechanical spaces in basement and first floor in existing commercial building and occupy per plan.

Documents

City documents for this project's records are filed at Seattle EDMS:
3003793-LU
3011479-EG
3011479-LU
3015121-LU
3027763-LU
6254208-PH
6339746-DM
6356939-CN
6357057-CN